Most hotel owners can tell you what the FM contract costs each month. Few can tell you which room nights it failed, which piece of plant caused it, or what the credits are worth against rooms revenue. A twin that joins the contract, the BMS and the bookings answers all three.

The problem: the contract is green and the guests are warm
An integrated FM contract usually reports on response. How fast a job was logged, attended and closed. Those KPIs are easy to measure and easy to hit, so the monthly report comes back green.
Comfort is different. Most contracts promise that guest rooms stay inside an agreed temperature band for a share of occupied hours, and credit the owner when they do not. In practice that clause is hard to enforce. The BMS knows the room temperatures, the PMS knows which rooms were sold, and the contract sits in a PDF. Nobody multiplies them together, so the credit is argued about, estimated or simply missed.
Take the demo hotel, Azure Crest Hotel and Residences: 402 rooms on 36 floors, run by an integrated hard and soft FM operator under a five-year contract. All four response KPIs sit inside target. Yet the operator delivered 96.4 % of occupied room-hours inside the comfort band against a contracted 98.0 %. That 1.6-point shortfall produced AED 218.4k of credits in a single month (demo figures).
The contract is being missed on comfort, not on response. A response report will never show it.
Who this is for
- Hotel owners and asset managers who pay the FM bill
- General managers and directors of engineering who live with the complaints
- Owner's representatives preparing an FM contract renewal or retender
- Operators of branded residences and resorts running under a management agreement
What the twin joins up
Synopton builds a live 3D twin of the hotel and connects it read-only to the systems that already hold the answer: the BMS, the CMMS and helpdesk, the PMS, guest reviews, energy metering, CCTV and the FM contract itself.
Once those sit on one model, the comfort clause becomes something you can compute rather than debate:
- The BMS gives room temperatures, hour by hour, on every floor.
- The PMS says which of those rooms were occupied and sold.
- The contract schedule gives the band, the target and the credit per point of shortfall.
- The twin works out occupied room-hours in band, the shortfall and the credit due.
In the demo, the result is specific. 412 room nights on floors 9 to 14 were sold outside the comfort band, concentrated between 12:00 and 18:00. The exceedance heat map of floors against hour of day points at one chilled-water loop. Three KPIs that are red or amber at renewal, on comfort and on energy, share that single root cause. Fixing one chiller moves all three.
Guest reviews follow the same logic. Each theme is routed to the asset behind it, and only themes scoped to this hotel and classed as hard or soft services count against the operator. Market-wide complaints are shown for context and never charged.
The number the owner actually reads
Credits on their own are hard to judge. The twin expresses them two ways an owner recognises: as a share of rooms revenue for the month, and as net FM cost per room night sold. That second figure is the one a benchmark survey cannot give you. It is the FM bill, minus the credits, divided by the nights the hotel actually sold, and it moves when the plant improves.
A what-if shows the other side. Set the comfort band to delivered and the twin shows what the month would have looked like, so the owner can weigh the credit income against the guest experience they would rather have.
Why the numbers hold up
A credit claim only works if the operator accepts the figure. Every number in Synopton carries a provenance chip: measured, modelled, published, assumed or forecast. Press Why? and the panel shows the inputs, the contract schedule applied and each step of the calculation.

If a BMS point drops out, the figures that depend on it switch to assumed and say so. Ask the twin a plain question, such as "why are we short on the comfort band this month?", and the answer cites the twin's own data rather than a guess. Accepting a recommendation drafts a decision record with an owner and a deadline: in the demo, cleaning the chiller condenser tubes today and rebalancing the floors 9 to 14 branch, with the measured result tracked afterwards.
Nothing writes back. The connectors are read-only, so the BMS, the CMMS and the operator's own systems are never changed.
See it running
The hotels page shows what the hotel twin watches, from the comfort band by floor to the lift, fire, pool and kitchen certificates. The live console streams the demo hotel's cameras and event log, and the platform page explains how a figure becomes a decision record. Request the full demo to open the FM contract view yourself.
What it costs
We quote after a 30-minute scoping call. The pilot runs on one hotel with your own data for a fixed fee agreed at scoping, credited against the first year if you continue. After that, Site is an annual subscription per asset, scaled by the number of connected sources and cameras, and Portfolio covers many hotels under one agreement. See how the pilot works.
Price your FM contract properly
Send us the hotel, the FM contract you run under and the month that felt worst. Email info@synopton.com or book a scoping call, and you get the full demo straight away.
Questions buyers ask
Our contract does not have a comfort clause. Is this still useful?
Yes. The same join of BMS, bookings and work orders shows which room nights the plant let down and what that cost, which is exactly the evidence you want before a renewal or retender.
Will our FM operator see this?
That is your choice. Roles, SSO and the audit log control who sees what. Many owners share the comfort view with the operator so both sides work from the same figure.
Do we need BIM to build the hotel twin?
No. We can build it from floor plans, drawings and an equipment list. If you have BIM, IFC or GLB models, we load them.
Does Synopton change settings in our BMS?
No. Connectors are read-only. Recommendations become decision records for people to agree, and nothing is written back to building systems.
Your site, your data
Want to see what your FM contract really costs?
Tell us the asset and the question it has to answer. You get the full demo straight away, and we come back within one working day to book 30 minutes.